1. sayfa (Toplam 1 sayfa)

Competition

MesajGönderilme zamanı: 05 Oca 2017, 17:26
gönderen eyupucmaz
1) Loads will be parachuted?
2) 2. What will be the parachute release order on duty and where to leave?
3) What are the measurements of matrix and parachute release area in the given map?
4) What is the distance to the pistol duty area?
5) Will there be more information about the conceptual design report and the detailed design report? Will a draft report be published?
6) How will the rating system be?